We recently delivered a comprehensive steam boiler installation. The project involved three Bosch steam boilers, with integrated economizers and a capacity of 5 tons per hour, bringing the total system capacity to 15t/h. These boilers were equipped with Low NOx gas burners to ensure both high efficiency and environmental compliance, addressing stringent emissions standards.
Moreover, the installation featured various additional components to ensure a complete, fully functioning steam system. From control units and backup batteries to chimneys and sound dampers, all details were covered. Key elements like the condensate tank and feedwater tank were also included, ensuring seamless operation across the entire system.
It’s not about machines. It’s about solutions. Total Solutions.
At Eco, we pride ourselves in offering more than just equipment. We provide a Total Solution, handling everything from commercial and project management to technical pre-commissioning. This particular project involved creating 3D models for precise planning, managing certifications to meet regulatory requirements, and offering a full suite of documentation and warranties for peace of mind.
We also oversaw the transportation and installation, managing the logistics with precision and ensuring that all components arrived safely and on schedule. Our "A to Z" project management approach means we’re involved in every stage—from the initial concept and planning through to installation and commissioning.
A Total Solution to say the least!